The 183 Toll project is an 8-mile toll road along US 183 from US 290 to SH 71 in East Austin. This project triples the roadways previous capacity. Combined with other roadways, makes it possible for drivers to travel from Austin-Bergstrom International Airport through Leander without stopping.
Our portion of the job included installing drilled shafts for 38 different bridge structures. Drilled shafts ranged from 18” to 72” in diameter, up to 75’ deep, approximately 60,000 total linear feet.