Featured Projects

The 635 East Project

The 635 East Project is a $1.74 billion design-build roadway construction project by the Texas Department of Transportation (TxDOT) to improve mobility, operations and safety along Interstate

Read More »

OKC 499 Sheridan Building

Location: Oklahoma City, OklahomaApproximately 250 drilled shafts were performed with diameters ranging from 24” to 60” with maximum depths exceeding 90’. This was a turn

Read More »

George Bush Turnpike W. Extension (SH161)

This project will provide a new approximately 11.5-mile link in the growing loop around Dallas. We installed thousands of drilled shafts ranging from 18” to 120” in diameter, up to 100’ deep, approximately 140,000 total linear feet.

Read More »

SH 121 Southwest Parkway Section 2C

Southwest Parkway is a $1.3 billion dollar proposed 8.7 mile, six-lane tollway that extends from the City of Fort Worth’s Central Business District at IH 30 to southwest Fort Worth. We installed over 1,000 drilled shafts of all sizes.

Read More »

US75 North, Central Expressway

The new North Central Expressway facility has a minimum of 8 continuous general-purpose lanes and is in a trench for six miles. The total lineal feet of drilled shafts installed was in excess of 123,000.

Read More »

State Highway 130

The SH 130 extension, which opened in 2012, is from SH 130/SH 45 Southeast near Creedmoor to I-10 east of Seguin. Our portion of this project included installing 1,760 drilled shafts of all sizes.

Read More »

Marsha Sharp Freeway

The Marsha Sharp Freeway is Lubbock’s primary east-west access road. Our work consisted of retaining walls and bridge structures and included approximately 1,000 drilled shafts of various sizes.

Read More »

Horseshoe Project

The Horseshoe Project is a $798 million dollar project that will upgrade the I-30 and I-35E bridges that cross the Trinity River, as well as the Mixmaster.

Read More »